Abstract

In recent years, the capacity of distributed generations has a rapid growth, high penetration of distributed generation technology is facing new problems compared to the traditional distribution network. Therefore, it is necessary to evaluate the grid-connection before the distributed power source is connected to the grid. In this paper, based on the actual distributed photovoltaic and energy storage power generation system, the power control capability and response speed of the hybrid energy storage system are tested, The grid-connection of hybrid energy storage system and photovoltaic power generation system under smooth fluctuation, tracking plan instruction and peak to valley power generation scenario is evaluated, Provide a reference for the follow-up of distributed generations collocation network evaluation technology.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call