Abstract

In a distributed generation (DG) system, several renewable agents are connected to the low-voltage 3-phase utility grid through an inverter which is used as power condition and must guarantee the higher efficiency of the renewable agent. To attain this level of efficiency, a unitary power factor (FP) between the inverter currents and the utility grid voltages is necessary, and a synchronization algorithm is needed for the perfect synchronization between the renewable agent and the 3-phase utility grid. Within this context, this paper gives a performance study of the Positive Sequence Detector plus a Synchronous Reference Frame Phase-Locked Loop (PSD+dqPLL) as the synchronization algorithm, evaluating its accuracy under different conditions and studying their advantages and drawbacks. A grid-connected photovoltaic system with a nominal power of 6kW is used so as to evaluate the behavior of the synchronization algorithm when the 3-phase utility grid is affected by some disturbances such as voltage unbalances, frequency variations and harmonic distortions. Firstly, several simulations with a disturbed 3-phase utility grid using MATLAB/SIMULINK from The MathWorks, Inc. are shown, and secondly, the previous tests are run in a Real-Time Digital Simulation (RTDS) platform in order to validate the obtained results with simulations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call