Abstract
On 12 May 2008, an earthquake of magnitude 8.0 on the Richter scale occurred at Wenchuan in China. Zipingpu dam also experienced the earthquake. The maximum ground acceleration near the top of the 156 m high rockfill dam exceeded 2 g . The right dam abutment slope, which accommodates all the discharge facilities, remained intact after this severe earthquake. However, the natural slopes on the opposite side of the reservoir were severely damaged. It has been found that the reinforcement provided by more than 1000 prestressed cables in the right abutment slope helped to stabilize it. Measurements from multipoint extensometers and load cells installed in the slope showed that there were sudden changes in displacement and stress during the earthquake. This is clear evidence that reinforcement with anchored cables can be successfully used to stabilize a slope.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Quarterly Journal of Engineering Geology and Hydrogeology
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.