Abstract

AbstractDevelopment management in national rural development has been the subject of much discussion as old‐style integrated rural development planning met with increasing criticism. The Royal Government of Thailand is currently attempting to arrive at comprehensive reform of the development management system within the framework of implementation of its national five‐year plans. This article highlights the reforms and the analysis of past failures. It introduces the new management organization and some procedural highlights. A first experiment with the new system which is currently being carried out in the province of Nakhon Ratchasima is documented, and the opinion of government officials on its performance is reported. The overall reaction is positive: the system does provide a more coordinated implementation. Two bottlenecks remain, however: project monitoring and evaluation should be strengthened; and additional technical training in development planning is needed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call