Abstract

In Texas, many miles of plain jointed concrete pavement (JCP) were constructed without proper load transfer devices such as dowels. After a number of years of service, some JCP sections without dowels showed distresses in the form of faulting at transverse joints. Some of the sections were designed in accordance with the AASHTO 1986 Guide, which required 50–75 mm thicker slabs in exchange for not using dowels. This pavement design did not work, with faulting at transverse joints that cause poor ride. Dowel bar retrofit (DBR) was performed on four projects to restore the pavement condition. Overall, DBR restored load transfer efficiency and resulted in improvement of ride quality. Even where the subbase stiffness is 5–10 times less than the minimum value required for proper performance of JCPs, properly installed DBR effectively restored pavement condition with minimum faulting after decades of service. Therefore, it indicated that DBR is able to minimize the faulting even where there is poor base/subgrade...

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call