Abstract

A system subject to an accumulating deterioration and continuous monitoring is analyzed in this article. The system deterioration is modeled using a gamma process, and the system is considered as failed when its degradation level exceeds a failure threshold. The maintenance team lasts a fixed time to start the maintenance actions. To prevent downtime, an alert signal is sent in advance to the maintenance team when the degradation level of the system exceeds a preventive threshold. At the maintenance time, three maintenance actions can be performed: preventive replacement, corrective replacement, and imperfect repair. We assume that the repair is imperfect, in a sense that it reduces a part of the degradation accumulated by the system from the last maintenance action. Under these assumptions, integral equations fulfilled by different performance measures are obtained. Numerical examples are given that illustrate the analytical results.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.