Abstract

An owner delegates investment decisions to a better informed manager whose time preferences are unknown to the owner. Due to exogenous capital constraints, not all profitable projects can be undertaken, and therefore the owner wants the manager to select the NPV-maximizing set of projects. We show that the relative benefit cost allocation scheme proposed by prior literature does not solve this problem. Adopting the same information structure as in Rogerson (J Polit Econ 105, 770–795, 1997) and Reichelstein (Rev Account Stud 2, 157–180, 1997), we demonstrate how to obtain robust goal congruence using residual income. The resulting revenue recognition and cost allocation rules lead to a performance measure reflecting the expected NPV-ranking of projects in each and every period.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.