Abstract

Appropriate treatment of wastewater before disposal into the environment or reuse is very important in the quest to protect the environment and safeguard public health. This paper investigated the performance evaluation of a waste stabilization pond (WSP) for treatment of wastewater from a tertiary institution campus located in Jos North Local Government Area of Plateau State in North Central Nigeria. The waste stabilization pond of the tertiary institution campus was designed for a wastewater flow rate of 12,945 m3/day. In order to evaluate the performance of the WSP, a model was developed following the Froude’s number dimensional analysis technique. The model was evaulated based on a wastewater flow of 0.4 m3/day. The final effluent from the maturation pond had 80 mg/L BOD, 195 mg/L COD, 75 CFU/100ml Total Coliforms, 610 mg/L Total solids, 19 mg/L Total Nitrogen, 210 mg/L Chloride, 28 mg/L Phosphate, 1.3 mg/L Ammonia and 7.0 pH. The WSP was able to achieve an overall efficiency of 77.78% reducing all quality parameters to recommended limited with exception of total nitrogen and phosphate. The implementation of this design will go along way to aid the treatment of wastewater from the campus of the university.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call