Abstract

Performance of SBR treatment for nitrogen removal from tannery is evaluated for a wide range of wastewater temperature between 7 and 30 degrees C. A pilot-scale SBR unit fed with plain-settled wastewater is operated on site for this purpose. Effective nitrogen removal is sustained by adjustment of the sludge age from 28 to 5 days. Concentration profiles of nitrogen compounds within a selected complete SBR cycle during the steady state operation at different wastewater temperatures and sludge ages are evaluated by model simulation. System performance is also interpreted in terms of modeling and stoichiometric calculation. Additional nitrate loss was observed during aerobic period when the aeration intensity was reduced by the factor of 50%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.