Abstract

This study was conducted to determine the performance of lightweight air-mixed soil (LWS) for expanded road construction for a short-term period without any soft ground improvement. The unconfined compression strength and capillary rise of lightweight soil and the settlement of the soft ground were measured. The unconfined compression strengths of the samples cured at the site for 1 or 5months all satisfied the required target strength of 500kPa. However, the homogeneity of construction was not verified because the values of strength depended on the sampling location. In addition, the strength difference between the laboratory and site samples was found to be approximately 19%, and thus, it should be considered for mixing design. The capillary rise was approximately 20cm for 70h because of the numerous tiny pores inside the lightweight soil. This phenomenon changes the density of the LWS. The relationship between the settlement time and the settlement of the soft ground underneath the expanded embankment was estimated by using the monitored data and back analysis. The current average consolidation ratio and the final settlement after 120months were estimated to be approximately 32% and 4.5cm, respectively. This settlement is much less than the allowable settlement of 10cm. Consequently, the LWS used in this site was successfully applied to reduce settlement and ensure stability.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call