Abstract

In order to obtain the transient power system measurement information, Wide Area Monitoring Systems (WAMS) should be able to collect Phasor Measurement Unit (PMU) data in a timely manner. Therefore along with the continual deployment of PMUs in Great Britain (GB) transmission system substations, a high performance communications infrastructure is becoming essential with regard to the establishment of reliable WAMS. This paper focuses mainly on evaluating the performance of the real-time WAMS communication infrastructure when Multi-Protocol Label Switching (MPLS) capability is added to a conventional IP network. Furthermore, PMU communications from geographically distributed substations to a Phasor Data Concentrator (PDC) are investigated over different transport protocols. Using OPNET Modeler, simulations are performed based on the existing WAMS infrastructure as installed on the GB transmission system. The simulation results are analyzed in detail in order to fully determine the different characteristics of communication delays between PMUs and PDC.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.