Abstract

ABSTRACT This article presents a heterarchical scheduling approach for flexible manufacturing systems. The approach adopts a multiagent cooperative problem solving paradigm by using a bidding mechanism based on the contract net protocol to generate the production plan and schedule. Overall, scheduling is implemented using a Production Reservation approach. A typical job shop testbed demonstrates the effectiveness of this approach by comparing its performance to heuristic dispatching rules. Production Reservation augmented with the heuristic dispatching rules has also been shown to be even more effective, and should prove especially valuable in large variety discrete part and assembly manufacturing processes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.