Abstract

In this paper, we consider a discrete flow model with transportation delays for more realistic performance evaluation and optimization of failure-prone manufacturing systems. This model is applied to a manufacturing system composed by a single machine, a buffer and a stochastic demand. The goal of this paper is to evaluate the good buffer level taken into account the transportation time, the machine failures, the inventory cost, the transportation cost and the lost sales cost. The estimators of the difference of the total expected cost are proven to be unbiased and a simulation algorithm is proposed to evaluate the performance of the manufacturing system in the presence of transportation delay.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.