Abstract

In this paper an attempt is made to evaluate performance indices based on industry — wide practice and to suggest possible approach for improving the operational efficiencies of Jebba, Kainji and Shiroro hydro power generating stations. To actualize that, data including average daily gross operating head, daily flow rate and daily energy generated were obtained from Jebba, Kainji and Shiroro power stations and the National Control Center (N.C.C) Osogbo. From the energy (MWh) generated the average daily power generated (MW) was computed. Consequently, the average operational efficiencies of Jebba, Kainji and Shiroro hydro schemes were evaluated and found to be 89.43%, 88.45% and 94.03% respectively. Similarly, performance indicators including deemed generation, auxiliary energy consumption, availability factor, capacity index, workforce deployment, forced outage factor, scheduled outage factor and average production cost were evaluated and technical inferences made. The study was limited to the year 2010 due to non — availability of data for other years.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.