Abstract

Due to the large presence of solar power plant in electric power networks, it became obligatory to study the interaction between them and the associated networks. In this paper, a Distribution Static Synchronous Compensator (D-STATCOM) is used to improve the performance of a photovoltaic generation plant (PV) during three phase fault of interconnected grid. Artificial neural networks (ANN) based on Lightning attachment procedure optimization (LAPO) is used to tune the control parameters of D-STATCOM in targeted with PV plant. The LAPO is used for generating historical data needed for ANN. In order to point out the contribution of this paper, the performance of PV system without and with D-SATCOM is compared during three-phase fault and when D-STATCOM is tuned by LAPO only and by proposed ANN.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call