Abstract

In this paper, we consider a single-machine scheduling problem, with the aim of minimizing the weighted sum of the completion time. This problem is NP-hard, making the search for an optimal solution very difficult. In this frame, two heuristics (H1), (H2) and metaheuristic tabu search are suggested.To improve the performance of this techniques, we used, on one hand, different diversification strategies (TES1 and TES2) with the aim of exploring unvisited regions of the solution space. On the other hand, we suggested three types of neighborhoods (neighborhood by swapping, neighborhood by insertion and neighborhood by blocks).It must be noted that tasks movement can be within one period or between different periods.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.