Abstract

Placing Distributed Generation (DG) into a power network should be planned wisely. In this paper, the comparison of having different installation arrangement of real-power DGs in transmission system for loss control is presented. Immune-brainstorm-evolutionary programme (IBSEP) was chosen as the optimization technique. It is found that optimizing fixed-size DGs locations gives the highest loss reduction percentage. Apart from that, scattered small-sized DGs throughout a network minimizes transmission loss more than allocating one biger-sized DG at a location.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call