Abstract

A thin epoxy overlay application is a capital preventive maintenance activity. Epoxy overlays reduce the rate of chloride ion ingress and extend bridge deck service life. Highway agency policies and manufacturer specifications require maintaining a 28-day curing period (7-day wet and 21-day dry curing) before the application of an epoxy overlay on bridge decks requiring new concrete for patches and repairs. Consequently, the contractors wait for 28 days to apply an epoxy overlay. Delaying application time increases project completion time and the cost of construction and mobility. The suitability of new concrete to receive epoxy overlays and the performance of overlays depend on several parameters including concrete strength, moisture, and tendency to crack. Such parameters depend on concrete mixture ingredients and wet and dry curing periods. This paper presents a performance-based procedure for evaluating the possibility of reducing the 28-day waiting period for a thin epoxy overlay application on new concrete. An experimental program was developed and executed to evaluate the impact of epoxy overlay application parameters and overlay performance using a tensile bond pull-off strength test. The results support developing a performance-based procedure for deciding on the suitable age of new concrete to receive a thin epoxy overlay. The pull-off bond strength of epoxy overlays applied at 7, 14, and 21 days, following a 7-day moist curing, shows the possibility of applying an epoxy overlay before the end of the 28-day curing period stipulated in the current specifications.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call