Abstract

The importance of performance assessment in the water industry is demonstrated by the increasing number of initiatives taking place around the world. Since the first initiatives, which started 15 years ago, the topic has evolved significantly although it still presents challenges to be tackled. Five years ago, a project on performance assessment of urban infrastructure services was submitted to the European Union under the COST programme. As a consequence, the COST C18 Action was created. This paper presents the main conclusions and future key research areas from the project. In the solid waste sector, existing practical experience is less advanced, but methodologies and conclusions will be equally applicable in performance assessment projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.