Abstract

A submergible 255 L prototype MFC module was operated under practical conditions with municipal wastewater having a large share in industrial discharges for 98 days to investigate the performance of two of the largest, ever investigated multi-panel stainless steel/activated carbon air cathodes (85 × 85 cm). At a flow rate of 144 L/d, power density of 78 mW/m2Cat (317 mW/m3) and COD, TSS and TN removal of 41 ± 16 %, 36 ± 16 % and 18 ± 14 %, respectively, were reached. Observed Coulombic efficiency and substrate-specific energy recovery were 29.5 ± 14 % and 0.184 ± 0.125 kWhel/kgCOD,deg, respectively. High salt content of wastewater (TDS = 2.8 g/L) led to severe inorganic fouling causing a drastic decline in power output and energy recovery of more than 90 % in the course of experiments. Mechanical cleaning of the cathodes restored only 22 % (17 mW/m2Cat) of the power output and did not improve nutrient removal or energy recovery.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.