Abstract

A lab-scale novel bio-diatomite biofilm process (BDBP) was established for the polluted raw water pretreatment in this study. Results showed that a shorter startup period of BDBP system was achieved under the completely circulated operation mode, and the removal efficiencies of nitrogen and disinfection by-product precursor were effective at low hydraulic retention time of 2–4h due to high biomass attached to the carrier and diatomite. A maximum NH4+-N oxidation potential predicted by modified Stover–Kincannon model was 333.3mgL−1d−1 in the BDBP system, which was 4.7 times of that in the control reactor. Results demonstrated that the present of bio-diatomite favors the accumulation of functional microbes in the oligotrophic niche, and the pollutants removal performance of this novel process was enhanced for polluted raw water pretreatment.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.