Abstract

Objectives: The sugar industry comprises various units, including feeding, crushing, evaporation, refining, and crystallization. The feeding system is the most crucial aspect of the sugar mill as the sugar-making process starts from here. So faults which occur here are divided into four categories minor, major, cease faults and walkout faults. This paper sets out to showcase a comprehensive analysis of the system's performance, availability, and profit. The study takes into account how minor, major, and cease faults can potentially impact the system's overall effectiveness. The findings of this research hold significant importance for sugar mills that prioritize optimal performance and profit. Methods: Primary data regarding various failures is collected from Ch. Devilal Co-Operative Sugar Mills Limited, Ahulana, Gohana. To find MTSF, Reliability, Availability, Profit etc., a mathematical model has been created. This model is based on the Semi-Markov process and Regenerative Point Technique and equations are drawn using exponential distribution and solved with Cremer’s rule and Laplace ­- Stieltjes transformation. Findings: A fault, Bagasse Jamming is considered a cease fault which occurs very frequently in the feeding system. Therefore, it is found that cease faults and major faults have more adverse impacts on the system's performance and availability than minor faults. MTSF, Availability and Profit are inversely proportional to these faults. When a major fault is 0.0035 and the cease fault is 0.0042, MTSF is nearly 100. So, to gain more profit we have to pay more attention to these faults. Novelty: The paper's results will aid in fault removal, increase availability, and optimize maintenance tactics in the sugar industry. Keywords: MTSF, Performance Analysis, Availability, Reliability, Minor, Major, Cease Faults

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call