Abstract

An unreliable assembly system is studied in which different types of components are processed by two separate work centers before merging to an assembly station with random breakdown. Blocking at the work centers and starvation at the assembly station may occur because of finite buffer sizes and uncertainties in job arriving times and processing/assembly times. We derive the system stability condition, and obtain formulas for the system state probabilities, blocking probabilities, starvation probability, stockout probability, system availability in the steady state. We also obtain the distributions of blocking times and first failure times, respectively. Through numerical examples, we elaborate on the monotonous properties of the performance measures, and draw the insights into the impacts of the system parameters on its various performance indices, which provide important guidance for design of assembly systems.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.