Abstract

The power sector in Uganda has increased steadily, focusing majorly on rural electrification to increase the proportion of the rural population accessing electricity using grid extension and isolated mini-grid approaches. Hydropower mini-grids implemented in rural communities have issues regarding system failures leading to shutdowns and load shedding. A study on an existing isolated hydropower mini-grid was made to find the possible causes. A review of published articles and reports, and an analysis of enrollment patterns, energy sales, and load demand was carried out. A field survey with a guided questionnaire to collect information about real energy demand data was carried out. The performance of the system was accomplished through simulation using HOMER pro × 64 software. The findings from the study show a reduction in customer enrollment, a reduction in energy sales, and a reasonable number of system shutdowns. Hybridization of the existing hydropower was modeled with different options. The hybrid system proposed indicates that, when implemented, it would reduce fuel consumption from 222 to 23.2 L/day and emissions from 82.5 to 8.3 kg/year on average and increases system reliability. Simulated values of NPC, LCOE, and operating costs are appreciable. Despite mini-grid shortfalls, there is notably improved livelihood due to improved social and economic services.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call