Abstract

This paper presents the performance of a 45.36 kWp grid-connected photovoltaic (PV) system at Malaysia Green Technology Corporation (MGTC), Bangi, Malaysia. The site is located at latitude of approximately 2.96°N and longitude of 101.75°E. The system was commissioned on 14th June 2007 and the system performance has been monitored since 1st Feb 2008. The system comprises 45.36 kWp of PV array size, a 40 kW inverter and other balance of system (BOS) components. An irradiance sensor and two temperature sensors are connected externally to the system via the inverter to obtain the irradiance, ambient temperature and module temperature profiles at the site. In contrast, other performance data such as AC current AC voltage, DC current and DC voltage are recorded from the inverter. During the monitoring period, all data were recorded based on 15 minute interval. The system had produced 787.25 MWh of solar electricity since its being monitored with an average daily output of 144 kWh. On the other hand, the inverter efficiency has been fluctuating from 86% to 97%. The average monthly final yield was found to be 96 kWhkWp−1 while the performance ratio (PR) varies from 71.37% to 91.99%.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.