Abstract

Grid-connected photovoltaic systems are required to introduce photovoltaic solar energy into urban areas. To analyze these systems, a 15 MWp power system has been installed at the site of Oued Keberit a town and commune in Souk Ahras, province in North-Eastern Algeria. The array power output was estimated by using measured I – V curves for the installed modules with minimization of mismatch losses. The supplied grid energy and main performances are described. Results show an annual performance of 83.9 % and the energy production is 23 735 MWh/year, which is sufficient energy to Power approximately 5 000 homes with clean renewable energy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.