Abstract

The interaction between a spudcan and an existing footprint is a major concern during jack-up rig installation. No guidelines were provided in the recently finalised version of ISO guidelines 19905-1 in regards to mitigating spudcan–footprint interaction issues except some proposed considerations due to scarce of detailed investigation. This paper reports a measure for easing spudcan–footprint interaction issues, with the efficiency of perforation drilling tested through model tests carried out at 1g. The soil conditions tested simulate soft seabed strength profiles close to the mudline, varying the undrained shear strength. The most critical reinstallation locations of 0.5D and 1D (D=spudcan diameter) and existing footprint depth of 0.33D were investigated. The removal of soil (through perforation) inside the spudcan perimeter, with an area of 9% perforated, reduced the induced maximum moment, horizontal force, and horizontal sliding distance by up to 80%, 83%, and 76% respectively.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.