Abstract
The existing square tower of intake has 1,397.57m3 volume and using shallow foundation Logung Dam with its weight stability will cause inefficient structures and potential to earthquake force effect. It is necessary to have an alternative planning of the intake tower. The authors intends to redesign the intake with morning glory type and used bored pile; to find out the position of intake tower, dimension, reinforcement, duration, cost estimate, and to compare the redesign.The required data were of topographic map, irrigation, and raw water discharge, bearing capacity, and work unit price analysis of project 2016. Manning Method was applied to find out the dimension; Shell Slab Method with Column Approach to calculate the structure of the intake tower, and Skempton Method to calculate bearing capacity. The redesign results in the position of ∅ 1.75-m intake tower on conduit channel with 728,08 m3 volume; the dominant load of operational-earthquake combination with different values; D22-200 steel bar for y-direction, D19-150 for x-direction on conduit channel, D19-150 for x,y-direction on intake tower segment 1, D16-150 for x,y-direction on intake tower segment 2, and D13-150 for x,y-direction on intake tower segment 3; on 105 workdays; at a total cost of IDR 2,327,806,700 with 40.64 % efficiency cost.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.