Abstract
Project completion work has problems related to project completion not being on time, thereby increasing costs and resources. The work on the gantry crane structure includes projects that experience problems related to incompatibility between project planning and actual project work. This study aims to plan project activities by speeding up processing time and providing prevention strategies to minimize project delays. This study uses the critical chain project management method using the cut & paste method by 30%. The results showed the total buffer time was ten days, consisting of eight project buffer days and two feeding buffer days. The total time for the semi-gantry crane structure project has accelerated from 43 days to 33 days. Suggestions for prevention that can be done to complete the project according to the plan are adding project workers, adding tools or machines, and eliminating multitasking activities that cause project workers not to finish their work immediately.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Operations Excellence: Journal of Applied Industrial Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.