Abstract

Daop 2 Bandung is one of the train operational areas where each station has a signaling system to maintain safety and regulate train operations so that they remain effective and efficient. This research aims to determine the maintenance planning system for the Type T84M Wesel Drive Motor using the RCM (Reliability Centered Maintenance) method in Daop 2 Bandung. The method used is RCM (Reliability Centered Maintenance) which focuses on secondary data in the form of historical data on disturbances on the T84M draft motorbike which is used to calculate maintenance time intervals based on the results of data distribution for each component according to the RCM (Reliability Centered Maintenance) method. The research results show that the appropriate maintenance tasks for wesel motor components are scheduled disposal tasks and scheduled restoration tasks. The T84M draft motorbike has a reliability value of 43.2% and an availability value of 99% and the recommended maintenance interval for the T84M draft motorbike is 3 days.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.