Abstract

<p>PT.X is a supplier company that manufactures plastic bottles. Currently PT.X has a<br />production capacity of 4.3 million bottles per day. The production capacity can be met if the<br />production machine running well and in a reliable state. PT.X not currently have a machine<br />maintenance activities are laid out well. This often caused many damage occurs unscheduled<br />engine which causes the cost of lost opportunity (opportunity cost) for the manufacture of<br />products and the high costs of component inventory. The method used in solving the problem in<br />this study is the use of Reliability Centered Maintenance analysis in determining the policy of<br />treatment and then seek maintenance intervals based on the minimum cost. The results obtained<br />are contained 8 components that have critical categories with each scheduled maintenance policy<br />is age replacement, with this calculation obtained a saving of approximately 44% on inventory<br />costs and increased reliability component approximately 42% -64%.</p>

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.