Abstract
The main issues that have been encountered in PT Surya Toto Indonesia is companies do not know how to measure the performance of the production process so as the utilization of resources that will be used isn’t yet to be known with efficiently. The purpose of this case studies is creating a better production processes by proposing a better and systematic scheduling information system. An Object Oriented Analysis and Design method is used to determine system’s requirements and design of the system architecture. Metaheuristic methods such as Discrete algorithms Levy-flight Firefly is used to improve the performance of the Hybrid Flow Shop machine scheduling become more better. Indicators that are used to determine the performance of the scheduling is makespan and lateness. Results from this algorithm is makespan value of 305.27 hours with lateness value of 10.92 which determine that there is no delays in scheduling. Scheduling information system was designed three primary capabilities, which are integrated data management, inventory management and a systematic and accurate scheduling system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: ComTech: Computer, Mathematics and Engineering Applications
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.