Abstract
Raw material requirement planning is generally needed by a company to support the production process. Currently, PT. Surya Rengo Containers Semarang, engaged in the manufacture of cardboard box or carton packaging, runs system that conduct raw material requirement planning based on the last month’s usage. Whereas in fact, raw material required doesn’t match the amount of usage in the next month. Lack or excess in the supply of raw materials may delay production process. Excess in raw materials can lead to full storage, where if the raw materials are experiencing a slow movement, may influence the age of the raw material. The raw material requirements planning system’s design aims to help the process of managing raw material needs and improve the accuracy of the reporting requirements to the raw materials management. Fast, precise and accurate information is needed in a computerized planning raw material requirements system. Systems development method uses System Development Life Cycle, with one step that is omitted in the development of this system, namely the maintenance phase / maintenance system. The results of this study is to provide convenience to the staff Production Planning and Inventory Control, in calculating and plotting the purchase of raw materials to be used for the production process within a month. The developed system is expected to create quality improvement in managing and controlling raw material requirements planning.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.