Abstract

Using sustainable energy as a source of electrical energy is a safe way to increase ecosystem energy. One of them is the utilization of photovoltaic directed energy by upgrading the PLTS on top of the structure as a mechanism for introducing photovoltaic modules. The study finalized the plan to install PLTS on the roof of the I Gusti Ngurah Rai Airport parking lot as a source of electrical energy to reduce PLN electricity bills. The I Gusti Ngurah Rai Airport Parking Roof Solar Power Plant uses a battery-free on gridsystem with 600 units of 555Wp monocrystalline solar-based modules and four 100kW inverter units. The solar power plant to be built on the car park of Terminal I Gusti Ngurah Rai will have a capacity of 333kWp and will produce 604.929kWh of energy annually. The required speculation cost is Rp 3.004.620.000 and payback period for 6 years.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.