Abstract
Abstract The ultimate power development for the Grand Coulee Dam includes eighteen main units of 150,000 hp each and three station-service units of 14,000 hp. Individual penstocks of 18 ft diam were provided for the main units and of 6 ft diam for the station-service units. The penstocks are of welded-plate steel construction, fabricated and X-rayed in accordance with the API-ASME Code. The 18-ft penstocks were fabricated in a plant erected near the dam, and the 6-ft penstocks were produced in the subcontractor’s shop. All penstocks were installed in octagonal tunnels provided for that purpose through the dam, and were embedded in reinforced concrete after installation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.