Abstract
The highest production in steel making process is the cost of melting in the Electric Arc Furnace (EAF). The higher the electricity cost , the higher the production cost would be. Some means have to be done, therefore, in the melting process, in order to achieve higher efficiency. One of them is by installing a water cooling panel system at the furnace’s wall and roof. Another way is by chemica reaction through oxygen injection into EAF. The combination of the two will result in tap voltage at higher current and long arc setting. By obtaining higher power factor and long arc, we can achieve higher productivity and electricity cost saving. Experience and data shows that the power factor and long arc obtained can save up to 1.9 Kwh per Nm3 oxygen. Using the data, if oxygen re increased until 30N m3/ton, the fixed production cost would increased approximately 5 % for every increase of Rp.100,-/Kwh in electricity cost. Therefore, in order to stabi e the production cost, energy transformation capacity should be increased to become 130 MVA which is combined with an adequate oxygen injection management
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.