Abstract

This research was conducted at PT. Starindo Sakti Award for 31 days. This study aims to determine whether or not there is a significant relationship between overburden stripping production and loss time. Because stripping of overburden is an activity that affects mining activities, the researcher is interested in analyzing every mining activity, especially in stripping the overburden layer at the mining front at PT. Starindo Sakti Award using a Kobelco SK-200 excavator. To determine whether or not the relationship between overburden stripping production and loss time is significant, the F test can be carried out. find out the deviation of the data. After conducting the F test, it turns out that the relationship between overburden stripping production and loss time is significant (very influential), as evidenced by the results Fhitung of 686 and Ftabel of 3.34 with a standard error of 5,8.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.