Abstract

To control a project we used CPM method which very use full to arrange a planning, scheduling and project control. Project is combined form many activity which link and it must followed by order before the entire work activity can be done successfully. To take on project controlling application is to find a critical dot to scheduling project. An arrow diagram is used to presenting an activity where the point ist to showed an a progress development way in project. The entire arrow diagram is giving a graphic representation aboat the relation between many project activity. In order way, circle diagram is used to presenting an even, where it doesn’t need time. On arrow hilt (where the activity begun) and on the end of arrow (where the activity end). The event first number are smaller than tic number. This CPM method is able to give a clear view about process certain critical line to make certain to a time schedule.   Keyword : slack/float, crash, Jalur Kritis, dummy ,Slope.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.