Abstract

Current Transfomer(CT) accuracy for big customers is very important. Constraints Execution of CT accuracy testing on big customers is quite a lot of customers and scattered, and longtime outage duration. Development of electronic kwh Meter for checking on-site CT customers as a solution to these problems. The onsite CT measurement method is carried out by comparing the primary and secondary of the CT by utilizing the current coil on the electronic kWh Meter. This method has several advantages, lower costs, easy procurement, easy and fast operation, so the duration of outages can be minimized. This method is very supportive in the implementation of the Revenue Assurance program.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.