Abstract

The Lahendong Geothermal Power Plant (PLTP) is the largest power plant in North Sulawesi. Turbine is one of the important components in a power plan, so performance and efficiency must be considered. Environmental temperatures that change on a daily basis can potentially affect turbine performance and efficiency. Therefore, it is necessary to analyze the turbine to determine whether the ambient temperature can affect the performance and efficiency of the turbine. The results of the study for 14 days at 10.00 and 22.00 showed differences in the value of turbine performance and efficiency. The turbine performance value is greater during the day than at night. Turbine efficiency is affected by the ambient temperature, when the ambient temperature increases there is a decrease in efficiency and when the temperature decreases there is an increase in turbine efficiency

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.