Abstract

Generally, factories always want to give bidden to consumer, therefore ne€d the best production of plain and schedule by programming linier method in order that can be eff€ctive and efficient. Reality main problem flom PT. Serasa Puma Cipta Sidoarjo was pile up of sort ploduct and little others product to next times and to threaten to the first skipsi about difficulty of factories to make QS program for actuality production ofexcellent schedule. Therefore how to actuality management of information system in ordsr that process prepamtion data in tll€ factories was not difficultly for the actuality. The meaning for based on and experienc€ last time, the factories to do that program was difficultly to program operation so production of excellent schedule realize difiiculty. To that answer need actually Management of information system for production of excellent schedule to every group product to every period.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.