Abstract

Facing the dry season, it is probable that there is a lack of water or excess distribution at one point during distribution to every house that uses PDAM water every day. This will result in community instability in using water and inaccurate users. Therefore, forecasting of the amount of water used in PDAM Kota Gorontalo for the next period. The method used to forecast is the Exponential Moving Average method. Criteria in determining the best method is based on the value of Mean Absolute Deviation and Mean Absolute Percentage Error. After forecasting each smoothing constant is compared, the best model. in predicting the amount of water use in PDAM Kota Gorontalo is an Exponential Moving Average with a smoothing constant of 0.15 because it has the smallest MAD and MAPE values.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.