Abstract

This study aims to understand how to allocate overhead cost in rubber-processing factory of PT. Sumber Djantin Sambas using Activity-Based Costing method. Furthermore, this research also attempts to compare the allocation results of the existing costing systems in PT. Sumber Djantin Sambas with those created through Activity-Based Costing systems. To accomplish these objectives, this study applies case study method. The main sources of data come from interview transcript and cost and financial documents. This study results show that the cost of goods manufactured for product SIR 20 and compound rubber are overcosted. Betweeen these two products, SIR 20 is more overcosted. The total overcosting of these two products reaches Rp 2.749.997.488,57. Using Activity Based Costing, company can allocate the costs more accurately and reduce the distortion effect of costs which is caused by traditional overhead allocation method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.