Abstract

The object of research used is the Blowmolding Department division, PT XYZ, with methods of observation, recording, and time study for each setup of change of activities carried out. Based on the data collection method, processing is carried out with the Single Minutes Exchange of Dies (SMED) method approach. The result of this study is that the majority of activities in the SMED method include internal activities, where in the setup process changes can be made to the work system. According to the activity category, it takes 3.28 hours while according to the work system category it takes 1.52 hours and 1.55 hours

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.