Abstract

With the increasing needs of productivity and the use of high technology in the form of machines and production facilities, the need for maintenance functions is growing. At PT. Surabaya Wire that produces nails and wires of problems that arise especially related to damage to nail making machine, it causes the hours to stop (downtime) and delay in the production process so that the engine performance becomes less effective. The purpose of the research is to determine the time interval schedule of care and know the action or maintenance activities to be done. To solve the problem in this research using Reliability Centered Maintenance (RCM) II method with Failure Modes and Effect Analyze (FMEA) calculation. RCM II defined a process used to determine what should be done for machine maintenance, whereas for FMEA it is defined as a method to identify the highest failure form on any machine malfunction. From the calculation result using FMEA and RCM II, we got treatment interval result on side shaft component (metal handlebar) with maintenance interval for 63 hours, for crank shaft component (metal road) with maintenance interval for 81 hours, and for Electric motor component with maintenance interval for 374 hours.

Highlights

  • With the increasing needs of productivity and the use of high technology in the form of machines and production facilities, the need for maintenance functions is growing

  • Reliability Centered Maintenance (RCM) II defined a process used to determine what should be done for machine maintenance, whereas for Failure Modes and Effect Analyze (FMEA) it is defined as a method to identify the highest failure form on any machine malfunction

  • Untuk komponen crank shaft (metal jalan) dengan jenis kerusakan bearing longgar perlu adanya kegiatan perawatan dengan scheduled discard task, untuk jenis kerusakan sambungan lengan patah perlu adanya kegiatan perawatan dengan scheduled discard task, jenis kerusakan pelumas bearing habis perlu adanya kegiatan perawatan dengan scheduled restoration task

Read more

Summary

Introduction

With the increasing needs of productivity and the use of high technology in the form of machines and production facilities, the need for maintenance functions is growing. Perhitungan ini dapat digunakan untuk mengetahui interval waktu perawatan mesin yang telah dilaksanakan di pabrik paku dan kawat tersebut secara efektif.

Objectives
Results
Conclusion