Abstract

Heat Exhanger Service Unit H101/08490 P.A Hilton Ltd that use for heat transfer experiment has a weakness because the water flow from the unit after taking heat will directly enter the storage tank, still have a high temperature ( >33 o C ). The use of practicum equipment for a experiment with a long enough duration will cause the cooling water are used have a high temperature and be ineffective for the heat exchanger cooling process. The purpose of making a Cooling Tower Type Heat Dissipator Model for Heat Exhanger Service Unit H101/08490 P.A Hilton Ltd so that the cooling water used to carry out the practicum will be maintained at a temperature of 28 o C-33 o C. Maintaining the stability of the cooling water temperature is expected to produce data that does not vary too much and can be done in a fairly long data collection range. The results of the performance and effectiveness test of cooling tower cooling show that the temperature increase is only 4 o C for 3 hours of testing and the cooling effectiveness increases and is relatively constant during the test time. This shows that the cooling system with a cooling tower can be used as a supporting medium for heat exchanger practicum in the Mechanical Engineering department.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.