Abstract

This study aims to identify the level of suitability of maintenance at Type B Bus Stations in East Jakarta based on Standard Operating Procedures (SOP), and to identify the Budget Estimate Plan for repair work at the three station. The object of this research is Rawamangun, Klender and Pinang Ranti Bus Stations. The data collection was carried out by preliminary observation, documentation and observation using a checklist table. The research method used is quantitative with a descriptive approach to describe the object under study and the research result. The results showed average suitability between the SOP of the bus stations and the maintenance showed an average of 79.52% (Rawamangun), 66.68% (Klender), and 61.46% (Pinang Ranti). Then the results of the calculation of the Budget Estimate Plan that are Rp. 11,185,125.73 (Rawamangun), Rp. 16,773,795.08 (Klender), and Rp. 16,852,275.49 (Pinang Ranti). It can be concluded that the building maintenance of the Pinang Ranti Bus station is the lowest compared to other stations. It causes poor maintenance of the facilities with damages which directly affects the comfort and safety of users.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.