Abstract

The operation of a standalone microgrid is often optimised by the central controller that decides the set-points of the local controllers of the distributed generators. However, the optimised set-points may not remain optimal for a longer period due to the variability of loads and renewable generations. This study proposes a technique for readjusting the dispatch of the suitable generation units, between the optimisations carried out by the central controller, to support load changes. To this end, the potential field concept has been suggested to be adopted by the loads to select the appropriate generation units. The decision is made based on different criteria, such as their cost, reliability, emission, and power loss. This process requires low computational efforts, and thus, can act and make decisions immediately. This is valid as far as the change in the loads is not substantial. For a change above a predetermined level, the microgrid's central controller steps in to optimise the system. The central controller also performs the regular optimisation periodically to retune the whole system and reconfirm the optimal operation. The performance of the proposal has been evaluated by numerical analysis and validates the success and efficacy of the proposal.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.