Abstract
The prestressed concrete tie to be used on the Model Line of the New Tokaido High Speed Railways were designed in August, 1961. This paper describes the problems in design and manufacture of PC ties and the details of PC ties designed by pre-tensioning and post-tensioning system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: journal of the Japan Society for Testing Materials
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.