Abstract

Central plant hot mix recycling is one of the popular techniques adopted for recycling of asphalt pavement materials. Literature review reports varied levels of performances (laboratory as well as field) of recycled mix compared to the performances of corresponding virgin mixes. Thus, there is a need for conducting performance-related tests before finalizing any recycled mix design. The present paper discusses laboratory study conducted on recycled mix design of two different Reclaimed Asphalt Pavement (RAP) samples, and subsequently develops an integrated mix-design-structural-design approach for hot recycled mix. The total cost of the asphalt layer construction is estimated considering the constituent proportion and the pavement design thickness so that the designer can choose the best option.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.